Publisher: Sweet & Maxwell
Date Published: Nov 2016
ISBN: 9780414047105
Binding: Paperback
JCT Sub-Contractor Collateral Warranty for the Employer (SCWa/E)2016 Current edition: SCWa/E 2016 Previous edition: SCWa/E 2011
JCT's Sub-Contractor Collateral Warranty for the Employer is designed for use where a warranty is to be given by the sub-contractor to the employer.
It can be used with a sub-contract let under the following JCT main contracts: Standard Building Contract (SBC/Q, SBC/XQ, SBC/AQ), Intermediate Building Contract (IC) and Intermediate Building Contract with contractor's design (ICD), Design and Build Contract (DB), Prime Cost Building Contract (PCC).
Price: £25.00+VAT